Important requirements for processing of concrete cosmetic
Concrete cosmetic
Created by Synfola®
Important information about
concrete cosmetic SBK-08
Before processing the mineral exposed concrete cosmetic SBK-08 the customer should clarify the following:
joints?
• Are shrink holes allowed in moderate
number?
• Drilling holes, holes from spacers,
concrete remainders, swollen sintered
layer repair spots, damages caused by
vibration needles etc. have to be defined
for concrete cosmetic.
• Uniformly closed surface, but holes from
spacers remain visible etc.?
• Unified, vivid or structured exposed
concrete look (colouring)?
• Optical appearance of surface?
Appearance before mineral finishing
with concrete cosmetic SBK-08
After finishing formwork type 5
- Panel structure has been partially changed
- Uniformly closed surface
- Unified colouring
Appearance before mineral finishing
with concrete cosmetic SBK-08
After finishing formwork type 4
- Panel structure didn't have to be changed
- Unified surface structure
- Shrink holes in moderate number
- Unified colouring